Name | HERMES-TP |
---|---|
Type | CubeSat |
Units or mass | 3U |
Organisation | INAF (National Institute for Astrophysics) |
Institution | Institute |
Entity | Government (Civil / Military) |
Nation | Italy |
Costs | $3,950,000 for the whole consortium including 6 spacecraft (HERMES-SP, HERMES-TP) with launches and operations |
Oneliner |
Demonstrate detector design (Silicon Drift Detectors coupled to GAGG:Ce scintillator crystals) and its performance. |
Description |
Realize a modular X/gamma-ray monitor for transient events. Achieve a significant impact on Gamma Ray Burst (GRB) science and on the detection of Gravitational Wave (GW) electromagnetic counterparts. New generation of scintillators (e.g. GAGG:Ce) coupled with very performing Silicon Drift Detectors (SDD) and low noise Front-End-Electronics (FEE) are able to extend down to few keV the sensitivity band of the detector. |
Sources | [1] [2] [3] |
Photo Sources | [1] |
Related Spacecraft
Name | Status | Launch | Orbit |
---|---|---|---|
HERMES-SP A (High Energy Modular Ensemble of Satellites Scientific Pathfinder) | not launched | 2023-12-30 | not launched |
HERMES-SP B (High Energy Modular Ensemble of Satellites Scientific Pathfinder) | not launched | 2023-12-31 | not launched |
HERMES-SP C (High Energy Modular Ensemble of Satellites Scientific Pathfinder) | not launched | 2023-12-31 | not launched |
HERMES-TP A (High Energy Modular Ensemble of Satellites Technological Pathfinder) | not launched | 2023-12-31 | not launched |
HERMES-TP B (High Energy Modular Ensemble of Satellites Technological Pathfinder) | not launched | 2023-12-31 | not launched |
HERMES-TP C (High Energy Modular Ensemble of Satellites Technological Pathfinder) | not launched | 2023-12-31 | not launched |
Last modified: 2022-12-29
Detailed HERMES-TP entry in the Database
Full Nanosats Database (much more data)